Final show plan
I have changed my ideas about the final show plan. This has been sparked after finding out about limitations on what we can do with the college space at Camberwell. My last proposal was for a five screen setup where the screens faced inward and formed five sides of a hexigon, with the sixth side left empty to allow entrance to the centre of the installation. Previous plan:
The problem with this setup was that the college does not allow work to be hung from the ceiling. This is what I had intended to do, with the video inputs also running along and from the ceiling. As a way round this I thought that I could run cables from wall to wall and then hang the screens and cables from this structure, but this would end up being too contrived and fussy. So to this end my latest proposal is to place the screens upon the floor tilted slightly upwards. With still images on the walls above. Obviously this has health and safety implications of its own, due to the cables (power/AV) needing to run across the floor, and indeed the screens themselves creating potential trip hazards. I will have to figure out a way to make this safe, potentially constructing a slight raised platform to run the cables under. All to be resolved :-) New rough plan:
The problem with this setup was that the college does not allow work to be hung from the ceiling. This is what I had intended to do, with the video inputs also running along and from the ceiling. As a way round this I thought that I could run cables from wall to wall and then hang the screens and cables from this structure, but this would end up being too contrived and fussy. So to this end my latest proposal is to place the screens upon the floor tilted slightly upwards. With still images on the walls above. Obviously this has health and safety implications of its own, due to the cables (power/AV) needing to run across the floor, and indeed the screens themselves creating potential trip hazards. I will have to figure out a way to make this safe, potentially constructing a slight raised platform to run the cables under. All to be resolved :-) New rough plan:
<< Home